Technical Power

Rigging
It is 162 ft from center floor to roof top, therefore a crane must be rented for any required rigging.

Pyrotechnics Permits
A permit to perform pyrotechnics during a show must be obtained from the Cedar Falls Fire Department and personnel must be on hand to assist in case of an emergency.

House Sound
UNI-Dome rents sound equipment unless all inclusive in show package. The expense to run house sound is included in the show expenses.

House Lights
House lights are operated via a computer system and an outlet in the tunnel locker rooms. The UNI-Dome can assign an administrator to control house lights and five other possible light settings.

Electrical System & Hook Up
(If doing a show with the stage in center floor, a feeder cable will be needed to reach the power source on the north end of the UNI-Dome.)

North End:
600 amp 3 phase 120-208 volt
400 amp 3 phase 120-208 volt
400 amp 3 phase 120-208 volt
200 amp 3 phase 120-208 volt

East Side:
3—150 amp 20 circuit 120 volt

West Side:
3—150 amp 20 circuit 120 volt

South End:
1—15 amp 20 circuit 120 volt

Shore Power:
Per Electricians